So, after my rather large purchase of parts, I have installed a large majority of them.
A quick list of what has happened.
- Front hubs/bearings repacked. I do so following the below walk-through. It was a somewhat surgical as I was using hemostats to hold the bearing carriers and wearing nitrile gloves. http://www.waltermotorsports.com/v/Racing/hub/
- The front suspension largely assembled.(Thanks Joey and Greg)
- The rear suspension is largely assembled. (Thanks Dave and Brandon)
- Kill switch plate tacked in. I had some wire feed issues with the welder, but I got it done.
- The front calipers are rebuilt, boots, seals, slider boots, bleeder valves (Thanks Greg)
- New wheel studs pressed in (Thanks again Dave)
- Install rotors all around and new calipers on the rear
- Install right side rear brake line
- Install the rear sway bar
- Install the exhaust
No comments:
Post a Comment